Transformer‑Russian EAC‑Certification Full Explanation
1. Core dividing‑line (voltage limitation, most critical rule)
EAC (CU‑TR / EAEU certification) is only valid for low‑voltage transformers with AC 50‑1000 V / DC 75‑1500 V.
High‑voltage transformers with rated voltage>1kV (6kV‑10kV‑35kV‑110kV‑220kV power transformers, instrument transformers CT/PT) CANNOT obtain EAC‑DoC or EAC‑CoC, EAC‑certificate is invalid for HV‑products, you have to apply Russia national‑level GOST‑R PCT certification separately.
Mandatory EAEU‑Technical‑Regulations for ≤1kV transformers
TR‑CU‑004‑2011: Low‑voltage equipment safety (core regulation; insulation, temperature‑rise, short‑circuit resistance, protection against electric shock)
TR‑CU‑020‑2011: Electromagnetic Compatibility‑EMC (compulsory for all transformers, including radiated interference and immunity‑test)
TR‑EAEU‑037‑2016: RoHS‑hazardous‑substance limits
TR‑EAEU‑048‑2019: Ecodesign & energy‑efficiency requirement for power‑distribution transformers for grid‑projects
For explosion‑proof / mining‑type transformers: additionally apply TR‑CU‑012‑2011 (EAC‑Ex certification)
2. Two EAC‑approval modes for low‑voltage transformers (≤1kV AC)
Mode‑1: EAC‑DoC (Declaration of Conformity, self‑declaration, Mode‑5D)
Applicable transformer types:
Small‑capacity control transformers, isolation transformers: single‑phase ≤4kVA, three‑phase ≤5kVA, non‑metering‑type, dry‑type, ordinary industrial auxiliary transformers.
Mandatory requirements:
An EAEU‑registered Authorized Representative (AR) submits documents and registers the declaration in official FGIS‑EAEU database;
Test report issued by EAEU‑recognized laboratory complying with GOST‑R‑IEC‑61558‑1 (transformer‑safety standard);
Full Russian‑language technical dossier: technical passport, design drawings, operation manual, nameplate, ISO9001‑2015 certificate, raw‑material reports;
Factory‑audit is NOT required;
Validity options: single‑batch (only for one export contract), long‑term for 1‑5 years;
Manufacturer and EAEU‑AR take full legal responsibility for customs random‑inspection.
Lead‑time: 7‑15 working‑days with moderate‑cost.
Mode‑2: EAC‑CoC (Certificate of Conformity, Mode‑1C / 3C, compulsory‑certificate issued by Rosaccreditation‑authorized bodies)
When EAC‑CoC is mandatory (cannot choose EAC‑DoC):
Power‑transformers: single‑phase ≥4kVA, three‑phase ≥6.3kVA; oil‑immersed transformer, photovoltaic‑transformer, energy‑storage‑transformer;
Metering‑purpose instrument transformers (CT/PT for electricity‑billing even for ≤1‑kV);
Explosion‑proof, mining‑purpose transformers;
Transformers installed inside complete‑transformer‑substation KTP equipment.
Hard conditions:
Samples must finish full‑set type‑testing in EAEU‑accredited labs following GOST‑R‑IEC‑61558‑1 and GOST‑R‑IEC‑61869‑2 for instrument‑transformers;
Long‑term 3‑5‑year‑certificate requires on‑site factory‑audit and annual surveillance‑audit every year;
Certificate is valid for all five EAEU‑member‑states: Russia, Kazakhstan, Kyrgyzstan, Belarus, Armenia;
Single‑batch 3C‑mode: only valid for one shipment without annual audit.
海关联盟EAC认证中心/上海经合工业设备检测有限公司 微信和手机:18621862553
Центр сертификации EAC Таможенного союза 沪ICP备10027014号-14
地址:上海浦东新区高科东路777号1号楼2017室 021-36411223 021-36411293 skype: gostchina
E-mail: eac@cu-tr.org 海关编码查询 沪ICP备10027014号-3
网站内容和图片版权所有,未经允许,不得转载复制拷贝和使用 海关编码